EN

Translate:

CONTACT US TODAY

  • Home
  • About
  • Immersion Cooling
  • Contact Us
  • Partners
  • Privacy Policy
  • Gallery
  • Recent Projects
  • News and More
    • Our Journey to Net Zero
  • More
    • Home
    • About
    • Immersion Cooling
    • Contact Us
    • Partners
    • Privacy Policy
    • Gallery
    • Recent Projects
    • News and More
      • Our Journey to Net Zero
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

EN

Signed in as:

filler@godaddy.com

  • Home
  • About
  • Immersion Cooling
  • Contact Us
  • Partners
  • Privacy Policy
  • Gallery
  • Recent Projects
  • News and More
    • Our Journey to Net Zero

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Recent projects

hybrid Build on Site

Build on Site Service

Build on Site Service

If you have a location which has limited or No access then consider our build on site service. We can install fresh air solutions to any location within your premises

Build on Site Service

Build on Site Service

Build on Site Service

A low weight modular construction makes the Damvent Range an Ideal Build on Site option for Clients with access restrictions on site

Build on Site Service

Units come supplied with the Heat Pump installed directly within the Hybrid AHU, this also includes both heat exchanger coils providing additional  space saving benefits to the Clients as well as cost savings on additional plant and Labour

Full on site service to provide you with the highest quality systems installed at competitive prices

Our Engineers are Fully Qualified; are Factory Trained and Carry Out Testing and Commissioning of all systems after installation on site.

ALL CLIMATES

ALL APPLICATIONS
ALL YOU NEED!

HHVAC SALES and service for all your needs

Find out more

Cullan Centre for Fusion Energy Hot Cell Cooling

Cooling High Voltage Switch gear located in a radioactive environment

CCFE JET ITER Project

One of our more interesting project sites was the Joint European Torus (JET), located at Culham Centre for Fusion Energy, is the world’s largest and most powerful tokamak and the focal point of the European fusion research program. Where We decommissioned a cooling only system operating on R22 and Installed a new system Operating on R410A in the HOT cell for the JET  Fusion Project.

Every day new clients bring new challenges

Working on this particular project we had to under take additional on site training from the Scientist's in charge of the project. This including training on safe working procedures within Radioactive environments

Just Checking!

Just Checking!

Gamma Radiation Monitor

 Always check the Radiation Meters before entering the Area, and again check the Radiation Meters for the Hot Cell before entering also!

Just Checking!

With Over 11 kVA being switched while radioactive material is circulated through the components and confined chamber

 The biggest concern in the area was to protect the high voltage components installed in the chamber from damage to ensure the main project did not suffer any delays or unnecessary downtime.

and to maintain the integrity of the protective earthed cage surrounding the Air conditioning system for the new installation. 

Find out more

HAMILTON HVAC LTD

124 City Road, City of London, EC1V 2NX

Copyright © 2009 HAMILTON HVAC LTD 

All Rights Reserved  HAMILTON HVAC - HHVAC - Air Protection Systems, DAMVENT UK SALES AND SERVICE -DVSS, Air Source Sales and Service are Trading Name's of HAMILTON HVAC LTD

Powered by